Completed Project: Power Station Monitoring Wells
Project Summary:
Objective:
- Monitoring wells at a power station
Problems:
- Overhead restrictions
- Aggressive water
- Time and sunstroke!
Solution:
- Boreline flexible drop pipe
Introduction:
This new Power Station is being built far from away from any Cities. It is in the middle of a desert where temperatures can soar to 120°F (49°C).
Boreline was chosen for a number of reasons:
- Firstly, there are overhead power cables that restrict access to the monitoring well. A crane cannot get close to these cables so installing the Boreline was ideal as this is done horizontally.
- Secondly, it is quick and easy to install Boreline thereby saving valuable time and manpower. Transporting the Boreline to site is also a major advantage.

The power cable is laid along the length of the Boreline and then attached to the hose using the Boreline Cable Straps. The Boreline will support the power cable along the entire length of the hose.